Our company’s 5000T and 3800T rental lifting beams for offshore booster stations operated steadily throughout the project with safe construction practices, successfully completing all hoisting operations with high efficiency. The equipment has now been demobilized smoothly and shipped back to our factory, where dedicated inspection, maintenance and modification work has fully commenced. Fully serviced and standing by, we stand ready to fully support the hoisting and construction requirements of our next client.



Following the successful conclusion of this hoisting operation, the two booster station lifting beams have been transported back to the factory in an orderly manner as scheduled, with comprehensive maintenance and upgrades carried out simultaneously. Multiple processes are underway in parallel, including complete machine disassembly, non-destructive testing (NDT), main structural reinforcement, replacement of wearing parts, and working condition adaptation optimization. Special rectification and reinforcement have been implemented focusing on critical load-bearing components such as load-bearing welds and connecting pin shafts of the lifting beams.

Every successful delivery stands as solid proof of our strength!
Moving forward, our company will accelerate the pace of equipment modification and maintenance, continuously optimize equipment performance and upgrade supporting hoisting services. With reliable lifting equipment, a professional technical team and efficient contract execution capabilities, we will empower the efficient construction of major national projects including wind power, photovoltaic and infrastructure sectors across the country.
We specialize in custom manufacturing and equipment rental of lifting beams for photovoltaic modules and offshore booster stations. Customers from all industries are welcome to contact us for inquiries and business negotiations.
Choose GN Ocean Engineering, Trust Our Professional Strength.